跳到正文
Rohan Paul· @rohanpaul_ai · X·· 2 小时前AI 评分47
AI 导读

台积电据报准备将CoWoS封装价格再上调最高20%,因AI封装需求超过供给。需求已从GPU扩散到服务器CPU和定制ASIC,代工厂与封装厂预计涨价10%至20%。设备交期从3-6个月拉长到6-8个月,更大封装还会降低单台设备每小时产出,进一步加剧产能紧张。

正文

TSMC is reportedly preparing another CoWoS price rise of up to 20% as AI packaging demand outruns supply.

CoWoS (Chip on Wafer on Substrate), joins an AI processor to its high-bandwidth memory on one densely wired base.

Demand has spread from GPUs to server CPUs and custom ASICs, so foundries and packagers expect 10% to 20% increases.

Supply can’t jump quickly, since equipment lead times stretched from 3-6 months to 6-8 months, and tool buyers no longer haggle.

Larger packages will deepen the squeeze, because they cut each tool’s hourly output, so even flat chip volumes need more machines.

They keep growing: TSMC chairman C.C. Wei says packages 5 times the largest printable chip are in mass production at excellent yields, with 9x and 14x planned.

来源:Rohan Paul · x.com